Skip to content

Obtaining Water Service

  • Below is a detailed description on the process of acquiring water service that includes the application, scheduling inspections and meter installations, curb stop and serviceline install, valves needed (e.g. pressure reducing), and meters. Information on cross connections, tampering, and use of district water for cooling is also provided.
  • Curb Stop Application | Cross Connection Control Form | Meter Installation Diagram